Manufacturing

What it costs to make, calculated from the bill of materials.

A bill of materials is a recipe with a different name. Knowing the true cost of a finished item means decomposing it properly, tracking the raw materials it consumes, and capturing what actually happened on the floor.

BOM-level
cost, not estimated
Shop floor
capture that survives no signal
Per site
roles and reporting

What we hear

If any of this sounds familiar…

01

Unit cost is an educated guess

Margin is calculated from category averages rather than from what the item actually consumed, so the unprofitable line stays unprofitable quietly.

02

The floor runs on paper

Production data is captured on a clipboard and typed in later, which means it is both delayed and wrong.

03

Raw materials surprise you

A shortage is discovered at the point of needing it, because consumption was never tracked against what was on hand.

What we build

The pieces this sector actually needs.

Bills of materials

Multi-level decomposition so a finished item resolves to its actual raw material consumption, and cost follows from that.

Work orders

Planned against stock on hand, with consumption deducted as production happens rather than reconciled monthly.

Shop-floor capture

Tablet and scanner interfaces designed for gloves and noise, with offline queueing for the parts of the building with no signal.

Raw material inventory

Stock ledgers with lot tracking and reorder points based on real consumption rate.

Supplier management

Purchase orders, receiving and the three-way match, integrated with whatever your suppliers can actually send.

Production reporting

Yield, scrap and cost per unit per line, on a read model that does not compete with operations.

Where this comes from

Proven somewhere real.

The BOM is the same primitive as recipe costing in InvtoryX: decompose a finished item into raw materials, deduct on production, derive true cost. The shop-floor capture is the offline-first device work from Larder and Eshop.

Go and read it

Tell us how your business actually runs.

The process, not the software you think you need. We’ll come back within one business day.

Reply time

One business day, from an engineer

Based in

Orlando, Florida · serving the United States

What happens next

  • A reply within one business day, from an engineer
  • A thirty-minute call, with no qualifying call before it
  • A written scope and a fixed number, if it fits